Welcome to KanDrive Roads



County: Wyandotte Type: Road Closing Description: Bridge Replacement
Start Date: 2/2/2018 Finish Date: 12/31/2020 Time Delay: Less than 15 min

Occurrence located between 423.77 - STATE LINE - (Route Intersection) and 423.12 - Bridge No. 105-B0177 carrying I-70 WB HIGHWAY over US-24 EB,RR, & 3 RAMPS Westbound I-70 will be closed past Broadway Blvd (in Missouri NW corner of the downtown loop) to 3rd St in Kansas City, Kansas for bridge replacement. Ramps from 5th St, Beardsley Rd, Independence Ave at Delaware and I-35 to Westbound I-70 (in Missouri) and Ramps from Westbound I-70 to Minnesota Ave, Washington Blvd, and Fairfax Trafficway will be closed. For Detour Info please go to www.ksdot.org/bureaus/kcMetro. Due to severe weather in 2019, these closures will continue into 2020. A new completion estimate will be made pending pier construction progress which is subject to high water conditions.

County: Marshall Type: Road Closing Description: New Roadway Construction
Start Date: 2/26/2020 Finish Date: 4/30/2020 Time Delay: Less than 5 min

Occurrence located between 228.96 - EJCT U36/U77 - (Route Intersection) and 228.96 - EJCT U36/U77 - (Route Intersection) The roadway is closed from one block south (Broadway St.) of the EJCT of US-36/US-77 on US-77 to the EJCT of US-36/US-77. FOLLOW DETOUR SIGNAGE

County: Finney Type: Road Closing Description: Bridge Expansion Joint Repair
Start Date: 2/10/2020 Finish Date: 4/3/2020 Time Delay: Expect delays

Occurrence located between 1.79 - Bridge No. 028-B0004 carrying US83 BS ROUTE over ARKANSAS RIVER and 1.95 - RIVERSIDE - (Route Intersection): This project will replace the south bridge expansion joint on the Arkansas River Bridge. The bridge will remain closed for the duration of the project. A detour route will be signed using US-83 and Fulton St from Main St East to the US-83 JCT.