Welcome to KanDrive Roads


  • WEATHER INFO:

    A FLASH FLOOD WATCH IS IN EFFECT FOR A LARGE PORTION OF THE STATE.CHECK WITH LOCAL AND REGIONAL WEATHER OUTLETS FOR INFORMATION. REMEMBER IF YOU CAN'T SEE THE ROAD BECAUSE WATER IS COVERING IT "TURN AROUND-DON'T DROWN"

  • “Road Closures in Kansas:

    Click here for list of closed roads due to flooding. If you come across a roadway covered in water: Turn around, don’t drown.



County: Wyandotte Type: Road Closing Description: Bridge Replacement
Start Date: 1/26/2018 Finish Date: 12/31/2019 Time Delay: Less than 15 min

Occurrence located between 423.77 - STATE LINE - (Route Intersection) and 423.12 - Bridge No. 105-B0177 carrying I-70 WB HIGHWAY over US-24 EB,RR, & 3 RAMPS Westbound I-70 will be closed past Broadway Blvd (in Missouri NW corner of the downtown loop) to 3rd St in Kansas City, Kansas for bridge replacement. Ramps from 5th St, Beardsley Rd, Independence Ave at Delaware and I-35 to Westbound I-70 (in Missouri) and Ramps from Westbound I-70 to Minnesota Ave, Washington Blvd, and Fairfax Trafficway will be closed. For Detour Info please go to www.ksdot.org/bureaus/kcMetro.

County: Doniphan Type: Road Closing Description: Flooding
Start Date: 5/24/2019 Finish Date: 5/28/2019 Time Delay: None

Occurrence located between 243.99 - STATE LINE - (Route Intersection) and 241.79 - WHITE CLOUD CITY LIMIT, OUT - (City Boundry) Flooding occurring. Find alt. route.

County: Marshall Type: Road Closing Description: Flooding
Start Date: 5/24/2019 Finish Date: 5/28/2019 Time Delay: None

Occurrence located between 252.05 - K9/K88 - (Route Intersection) and 247.49 - 25TH RD - (Route Intersection)

County: Pottawatomie Type: Road Closing Description: Bridge Rehabilitation
Start Date: 5/1/2018 Finish Date: 6/14/2019 Time Delay: None

Occurrence located between 2.19 - RS 536 - (Route Intersection) and 3.24 - Bridge No. 075-B0019 carrying K13 HWY over CEDAR CREEK

County: Logan Type: Road Closing Description: Bridge Replacement
Start Date: 2/27/2019 Finish Date: 11/8/2019 Time Delay: None

Starting the week of Feb. 18, the Kansas Department of Transportation will close a portion of K-25 near Russell Springs. The closure is necessary for a bridge reconstruction project approximately half a mile south of Russell Springs. Traffic will be detoured using U.S. 40, U.S. 83 and K-96 throughout the duration of the project, which is expected to be completed by mid -October .KDOT awarded the $1.6 million contract to L&M Contractors of Great Bend. For more information about the project and road closure, contact KDOT construction engineer Rob Percival at 785-877-3315 or rob.percival@ks.gov

County: Marshall Type: Road Closing Description: Flooding
Start Date: 5/24/2019 Finish Date: 5/28/2019 Time Delay: None

Occurrence located between 0.00 - VILLAGE OF VLIET - (Route Intersection) and 0.59 - K9/K87 - (Route Intersection)

County: Harvey Type: Road Closing Description: Flooding
Start Date: 5/23/2019 Finish Date: 5/27/2019 Time Delay: None

Occurrence located between 0.00 - NCL HALSTEAD - (Route Intersection) and 1.51 - U50/K89 - (Route Intersection) Road closed due to flooding.

County: Rush Type: Road Closing Description: Flooding
Start Date: 5/24/2019 Finish Date: 5/25/2019 Time Delay: Expect delays

Occurrence located between 149.74 - U183/K96 - (Route Intersection) and 117.16 - U283/K96 - (Route Intersection)

County: Lyon Type: Road Closing Description: Flooding
Start Date: 5/21/2019 Finish Date: 5/25/2019 Time Delay: None

Occurrence located between 101.19 - RS 1507 - (Route Intersection) and 104.01 - EMPORIA CITY LIMIT, IN - (City Boundry . . .K-99 is closed between county road 130 and the south city limits of Emporia due to flooding along the Cottonwood River. A local detour is provided via the Kansas Turnpike and local county roads.

County: Linn Type: Road Closing Description: Flooding
Start Date: 5/22/2019 Finish Date: 5/29/2019 Time Delay: Expect delays

Occurrence located between Ref Post 5 and Ref Post 8. K-152 will be closed from Maddox Road to the west city limits of La Cygne, KS due to water over the highway. This highway will be closed until the water goes down.

County: Finney Type: Road Closing Description: Road Reconstruction
Start Date: 3/21/2019 Finish Date: 7/1/2019 Time Delay: Expect delays

Occurrence located between 67.43 - FLEMING - (Route Intersection): and 69.62 - U50/K156 - (Route Intersection): This project will consist of removal and reconstruction of the concrete pavement from 3rd St to the south/east JCT of US50/US-83 in 2 Phases. In phase 1B local traffic and business access will be open from the west to the convenience store and the highway will be closed from the convenience store east to the K-156 overpass. A marked detour will be posted using US-50B/US-83B and K-156. Phase 1B will be the initial phase and will begin on 3-20-19 and last through June. See attached map

County: Cowley Type: Road/Bridge Const. Description: Bridge Replacement
Start Date: 2/28/2019 Finish Date: 2/3/2020 Time Delay: None

Occurrence located between 14.40 - Culvert No. 018-C0545 carrying US-166 HIGHWAY over NEGRO CREEK DRAINAGE and 18.90 - Bridge No. 018-B0037 carrying US166 HWY over ARKANSAS RIVER

County: Cowley Type: Road Closing Description: Bridge Replacement
Start Date: 10/29/2018 Finish Date: 1/17/2020 Time Delay: None

Occurrence located between 14.9 - US166 and Cowley 10 Road and 18.90 - Bridge No. 018-B0037 carrying US166 HWY over ARKANSAS RIVER

County: Allen Type: Road Closing Description: Road Reconstruction
Start Date: 4/19/2018 Finish Date: 8/30/2019 Time Delay: Greater than 30 min

Occurrence located between 50.75 - The junction of US-169 and K-39 and 69.10 - The junction of US-169 and US-54. The portion of US-169 from Hawaii Rd to 1150 (Humboldt-Chanute) Rd is now closed hard to traffic.

County: Edwards Type: Road Closing Description: Road Reconstruction
Start Date: 4/15/2019 Finish Date: 5/31/2019 Time Delay: Less than 15 min

US-183 is closed due to the reconstruction of the US-183/US-56 intersection. Traffic should follow the marked detour route on US-50 & US-56.

County: Barton Type: Road Closing Description: Flooding
Start Date: 5/24/2019 Finish Date: 5/26/2019 Time Delay: None

Occurrence located between 114.46 - RAILROAD ST- - (Route Intersection) and 108-Dent Spur, at the Washington street/281 intersection.