Welcome to KanDrive Roads




County: Wyandotte Type: Road Closing Description: Bridge Replacement
Start Date: 1/26/2018 Finish Date: 12/31/2019 Time Delay: Less than 15 min

Occurrence located between 423.77 - STATE LINE - (Route Intersection) and 423.12 - Bridge No. 105-B0177 carrying I-70 WB HIGHWAY over US-24 EB,RR, & 3 RAMPS Westbound I-70 will be closed past Broadway Blvd (in Missouri NW corner of the downtown loop) to 3rd St in Kansas City, Kansas for bridge replacement. Ramps from 5th St, Beardsley Rd, Independence Ave at Delaware and I-35 to Westbound I-70 (in Missouri) and Ramps from Westbound I-70 to Minnesota Ave, Washington Blvd, and Fairfax Trafficway will be closed. For Detour Info please go to www.ksdot.org/bureaus/kcMetro.

County: Pottawatomie Type: Road Closing Description: Bridge Rehabilitation
Start Date: 5/1/2018 Finish Date: 12/20/2018 Time Delay: None

Occurrence located between 2.19 - RS 536 - (Route Intersection) and 3.24 - Bridge No. 075-B0019 carrying K13 HWY over CEDAR CREEK

County: Sedgwick Type: Ramp Closing Description: Shoulder Work
Start Date: 10/1/2018 Finish Date: 10/14/2018 Time Delay: Less than 15 min

Occurrence located between 286.02 - I235/K96 - (Route Intersection) and 286.02 - I235/K96 - (Route Intersection) Closing EB K-96 Ramp to NB I-235 on Friday afternoon for shoulder replacement. will reopen Sunday afternoon. Traffic will be detoured to SB I-235 then turn around at the 25th St exit.

County: Graham Type: Road Closing Description: Bridge Replacement
Start Date: 7/25/2018 Finish Date: 11/16/2018 Time Delay: Expect delays

Occurrence located between Ref. Post 129.42 (Junction of US24/K18) and Ref. Post 152.69 (Junction US24/U183). Eastbound and Westbound thru traffic will be detoured onto K-18 and US-183 during construction, see posted detour signing however local traffic will be allowed to access properties. Please pay attention to construction workers and vehicles. The contractor for this project is King Construction and can be reached at 620-327-4251.

County: Edwards Type: Road Closing Description: New Roadway Construction
Start Date: 9/7/2018 Finish Date: 12/22/2018 Time Delay: None

Occurrence located between 157.05 - U50/U56 - (Route Intersection) Road closed for pavement reconstruction. Signed detour using US-50 and US-183. and 158.21 - U56/U183 - (Route Intersection)

County: Wyandotte Type: Road Closing Description: Bridge Rehabilitation
Start Date: 4/13/2018 Finish Date: 11/10/2018 Time Delay: Less than 15 min

Occurrence located between 156.15 - METROPOLTIAN AVE - (Route Intersection) and 157.16 - U69/K32 - (Route Intersection) Northbound and Southbound US-69 18th St Expressway will be closed from K-32/Kansas Ave to Ruby Ave for bridge repair on the Kansas River Bridge. Detour will be to take I-70 or I-35 to I-635 or 7th St. to I-70 or I-35 then back to US-69/18th St Expressway. Also closed will be the ramp from Kansas Ave to SB and Ruby Ave to NB.

County: Allen Type: Road Closing Description: Road Reconstruction
Start Date: 4/19/2018 Finish Date: 8/30/2019 Time Delay: Greater than 30 min

Occurrence located between 50.75 - The junction of US-169 and K-39 and 69.10 - The junction of US-169 and US-54. The portion of US-169 from Minnesota Rd to US-54 is now closed hard to traffic.

County: Kiowa Type: Road Closing Description: Bridge Repair/Patching
Start Date: 8/22/2018 Finish Date: 11/21/2018 Time Delay: Greater than 30 min

This project involves repairs on Culvert # 527, Bridge #009, and Bridge #101. The Westbound detour begins at the intersection of US 400/ US 54. The detour continues on West US 54 until you reach Bucklin, Kansas. Once you get to Bucklin and you come upon the intersection of US 54/K-34 you take North K-34 until you reach the intersection of US 400/K-34. At the intersection of US 400/K-34 you take West US 400. Once on West US 400 the detour is over. The Eastbound detour begins at the intersection of US 400/K-34. The detour continues south of K-34 until you reach Bucklin, Kansas. Once you get to Bucklin and you come upon the intersection of US 54/K-34 you take East US 54 until you reach the intersection of East US 400/US 54. At the intersection of US 400/US 54 you take East US400/US 54. Once on East US 400/US 54 the detour is over.